Healy is equipped with a JPC coring system
for taking deep sediment cores up to 25 meters. The JPC core is deployed
from the Starboard A-Frame using the 9/16" wire. The pivoting
core bucket is bolted to the deck under the A-Frame (this can only be done
in port). CTD operations can be carried
out when the core bucket is installed, however the CTD must be lifted over the
core bucket. Healy provides 4” core
barrels and science users provide core liner.
Healy typically has at least one 4,000 lb
core head and one 5,000 lb core head in inventory.
Click here for a
diagram of the JPC assembly and trigger mechanism. A DVD
video, which shows JPC operations on Healy, is available. Please contact the
Healy Marine Science Coordinator to receive a loaner copy.
Click here to view the most recent Healy JPC equipment inventory located at OSU in Oregon. (Click here for previous inventory and photos [XLS] or Photos.)
Healy also maintains a Gravity core
system on board.
Other coring operations on Healy have included multicore and vibricore.
< Back
|